Experience

Our team members have extensive experience in modeling of a wide range of commercial and intuitional through top notch engineering firms and research institutes. Samples of our experience include:

Broadway Block, San Diego, LEED 2009

Energy modeling, Daylighting modeling

Client: BOSA Development

Role: Energy analyst (Rienbold Eng.)

Energy simulation and daylighting simulation are used to assess the performance of the project in order to achieve LEED accreditation. The Broadway block is a full block mixed used development, comprised of 20- story and a forty-one story high-rise tower on top of a six-story podium and 3 levels of below grade parking. The podium is wrapped on the ground floor with two story retail spaces and a residential lobby for each of the two towers. On the upper podium levels, the parking levels are wrapped with residential units. The project uses VRV heating and cooling system.

Austin Avenue Towers, Building permit

Energy modeling

Client: Anthem Properties

Role: Energy analyst (Rienbold Eng.)

Energy simulate is used to assess the performance of the project in order to achieve building permit. The project is composed of two towers, 23 floors and 28 floors with a common platform and an amenity building. The project utilizes zone side water to air heat pump with a mixed water loop system.

Earth-side Net-Zero greenhouse

Energy modeling

Role: Researcher (SAIT polytechnic)

A group of EnergyPlus models were built to study the performance of a high-end energy efficient greenhouse prototype. The design incorporated the use of underground thermal storage water tanks connected to an array of solar collectors. Earth tubes were used to provide makeup air and a triple wall polycarbonate panels replaced normal glazing. Photovoltaic were used to generate required power.

Heritage Hall Energy Upgrade

Building envelope modeling, Energy modeling

Role: Researcher (SAIT polytechnic)

EnergyPlus models are used to study the effect of adding insulation to the existing non-insulated historical building of SAIT, then hydrothermal analysis using WUFI is done to study condensation and water control in the building envelope.

Vulcan Elementary School, LEED 2009

Measurement and verification, Energy modeling

Client: Natural Resources Canada (NRCan)

Role: Researcher (University of Calgary)

A calibrated model was built for a new LEED gold school according to IPMVP regulations. The building utilizes displacement ventilation, radiant slab, CO2 supply control, water efficient plumbing, heat recovery, and improved lighting. Results were compared with both MNECB and ASHRAE 90.1.

SHAW Data Center, LEED 2009

Energy modeling, CFD analysis

Client: SHAW Communications

Role: Energy analyst (Mechwave Eng.)

Whole building simulation and CFD were used to model a massive prospective LEED silver data center and office building. Systems in the building included evaporative cooling, VFD fan-coil systems and VAV systems.

CFD analysis was used to investigate innovative mechanical and natural air distribution techniques. In the above examples it was used to optimize the performance of the cooling system in server rooms.

Pepsi Cross Docking station, LEED 2009

Energy modeling

Client: Pepsi CO

Role: Energy analyst (Mechwave Eng.)

eQuest was used to model a prototype cross docking distribution building in order to achieve LEED silver. Technologies used in the project included heat recovery ventilation and high insulated envelope.

PIII Calgary Board of Education School

Energy modeling

Client: CBE

Role: Energy analyst (Mechwave Eng.)

Both EnergyPlus and EE4 were used to model a typical prototype LEED k12 school. Technologies used in the project included heat recovery ventilation and economizer. Results were compared with both MNECB and ASHRAE 90.1.

TransCanada Pipeline Tower, Cooling Upgrade

Energy auditing

Client: Cadillac Fairview

Role: Energy analyst (Mechwave Eng.)

A load profile was generated using energy simulation to address use pattern. The load profile revealed that cooling loads for more than 30% of the year are just 15% of the peak load. The proposed solution was to install a smaller chiller that works close to its maximum capacity during shoulder loads. That guarantees operation at maximum efficiency all the time. Energy simulation predicted 40% saving in cooling energy use. This is 15% of total energy use.

Shaw Court, Energy Efficiency Cooling Upgrade

Energy auditing

Client: SHAW Communications

Role: Energy analyst (Mechwave Eng.)

A comprehensive energy audit for the mechanical system was conducted. It was recommended to replace the constant flow heating and cooling water systems with variable flow. It was also recommended to add a variable frequency drive to the supply fan instead of damper control.

TELUS BC-hydro, Energy Efficiency Upgrade

Energy auditing

Client: TELUS Communications

Role: Energy analyst (Mechwave Eng.)

RETSCREEN was used to study the feasibility of various energy efficient measures. Recommendations included installing solar water heaters, cooling and heating coil bypass dampers, and fan VFD drives.

MechWave Arriva New Head Office, Design optimization

CFD analysis

Client: MechWave Engineering

Role: Energy analyst (Mechwave Eng.)

CFD was used to design the under floor air distribution system. Energy use was 15% more efficient compared with conventional design.